top of page
external-file_edited.jpg
Harvey School #10 mobile -PLAIN (370 x 150 px).png
CA-Recorder-Mobile-CR-2025[54].jpg
external-file_edited.jpg
Support Local Journalism Banner 1000x150.jpg

Mount Kisco developer adds parking to office building to gain approval for medical facilities

3 hours ago
4 min read
Buckingham Properties’ office building at 118 North Bedford Road has moved closer to a Planning Board approval. Its owner is looking to merge the property with an adjacent lot to provide additional parking to comply with parking requirements should it opt to rent space for medical uses. MARTIN WILBUR PHOTO
Buckingham Properties’ office building at 118 North Bedford Road has moved closer to a Planning Board approval. Its owner is looking to merge the property with an adjacent lot to provide additional parking to comply with parking requirements should it opt to rent space for medical uses. MARTIN WILBUR PHOTO

By MARTIN WILBUR

A plan for more parking and assorted site improvements for a Mount Kisco office building to accommodate potential future medical offices is nearing approval after the village’s Planning Board appeared satisfied with the applicant’s latest revisions.

Buckingham Properties is seeking site plan, subdivision and steep slopes permit approval for its nearly 35,000-square-foot building at 118 North Bedford Road. Representatives for the owner have proposed additional parking that would allow up to 26,800 square feet of medical uses by merging the 2.4-acre office building lot with an adjacent 0.4-acre lot at 126 Barker St. 

Buckingham Properties is looking to demolish a 3,800-square-foot house at the Barker Street site and add about 46 spaces of surface parking.

The Planning Board directed its planning consultant Jan Johannessen to prepare a resolution for approval for the Dec. 8 meeting as long as several changes are included in the plans. 

During site plan review and the extended public hearing, nearby residents objected to the proposal, citing dangerous road conditions and likely additional traffic volume caused by the medical uses.

No tenants yet

However, at Tuesday evening’s board meeting, Attorney Charles Martabano, representing Buckingham Properties, stressed there are currently no medical tenants lined up and that the building is at capacity with a variety of conventional professional office uses. He said his client wants the flexibility to secure medical tenants should there be future difficulties in renting space.

“We have right now a building that is completely full, tenants, normal office tenants who want to renew, so the chances that those effects coming in for years — I’m not talking about the full effects, I’m talking about a thousand square feet, 5,000, 7,000 — that’s years before that is even going to happen,” Martabano said. “It’s important to remember that.”

While the building meets code for office use in the General Office district with 121 spaces on site, if there should be a maximum conversion to medical tenants, it would need the additional parking to meet code.

Road safety

Discussion during this week’s meeting centered on additional steps Buckingham Properties should take to ensure road safety for residents and motorists, including drivers who will enter and leave the site. Project Engineer Rich Williams of Insite Engineering said where a sidewalk ends on Barker Street, the applicant will add a crosswalk and an ADA-compliant ramp to reach the site’s internal sidewalk and the building. There will also be a ramp extending from the North Bedford Road side.

Williams said a centerline audible roadway delineator, which is similar to a rumble strip, will be installed on Barker Street from Valley View Terrace to near the island close to North Bedford Road. 

Other road adjustments will include the painting of a shoulder stripe that will run close to the curb where Barker Street narrows to less than 22 feet and the installation of two yellow signs recommending drivers round the curve on Barker Street at 15 mph. 

The speed limit on the street is 25 mph.

“So, hopefully that helps,” Planning Board Chair Michael McGuirk said. “It sends a clear message that you should slow down on the curve.”

Limiting right turns

At the board’s request, the applicant will also adjust the curbing on the Barker Street entrance and exit so right-hand turns out of the property are difficult to make. 

Buckingham Properties has agreed that all exiting vehicles onto Barker Street must turn left, but there is concern some drivers will not obey that prohibition.

“It’s very difficult to see to the right,” board member Peter Alonge said. “That’s why you’re proposing no righthand turn, but it’s easy to make that right.”

A wall along Barker Street that could limit drivers’ sightlines will also be reduced and plantings and shrubbery near the Barker Street entrance will be cut back and replaced with more appropriate foliage, Williams said.

Board member Michael Bonforte raised concerns about a school bus stop along Barker Street for students going to West Patent Elementary School. He appealed to Williams and Martabano to work with the Village Board to make the street safer.

“We know there’s speeding, we know there’s non-observance of the stop sign coming down the hill, and I know it and I don’t live there,” Bonforte said.

Studies show no impact

Martabano said traffic studies conducted revealed that the office building will not have an impact on area traffic even if there were to be maximum usage by medical tenants.

The village’s former traffic consultant had earlier recommended speed humps and a roundabout to calm traffic. However, Elaine Du, the current consultant, said the road isn’t conducive to accommodating those measures.

“Based on my engineering judgment, these are not recommended on Barker Street because in my judgment the grade on the road is so steep,” Du said.

The applicant will also note on the plans how it intends to coordinate site work while the nearby Preston Way bridge remains shut and construction on that project gets underway and progresses next year.

The board agreed to close the public hearing but allow for written comments for another 10 days.

Related Posts

See All
PepsiCo 230x600.jpg
bottom of page